chore(deps): update actions/checkout action to v5 #8

Closed
srv.renovate wants to merge 1 commits from renovate/actions-checkout-5.x into master
Collaborator

This PR contains the following updates:

Package Type Update Change
actions/checkout action major v4 -> v5

⚠️ Warning

Some dependencies could not be looked up. Check the Dependency Dashboard for more information.


Release Notes

actions/checkout (actions/checkout)

v5

Compare Source


Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [actions/checkout](https://github.com/actions/checkout) | action | major | `v4` -> `v5` | --- > ⚠️ **Warning** > > Some dependencies could not be looked up. Check the Dependency Dashboard for more information. --- ### Release Notes <details> <summary>actions/checkout (actions/checkout)</summary> ### [`v5`](https://github.com/actions/checkout/compare/v4...v5) [Compare Source](https://github.com/actions/checkout/compare/v4...v5) </details> --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MS44Mi40IiwidXBkYXRlZEluVmVyIjoiNDEuODIuNCIsInRhcmdldEJyYW5jaCI6Im1hc3RlciIsImxhYmVscyI6W119-->
srv.renovate added 1 commit 2025-08-22 11:37:22 +00:00
djpbessems was assigned by srv.renovate 2025-08-22 11:37:23 +00:00
Owner

Results in the following error:

The runs.using key in action.yml must be one of: [composite docker node12 node16 node20 go], got node24

Closing without upgrade.

Results in the following error: ``` The runs.using key in action.yml must be one of: [composite docker node12 node16 node20 go], got node24 ``` Closing without upgrade.
djpbessems closed this pull request 2025-08-22 11:39:54 +00:00
Author
Collaborator

Renovate Ignore Notification

Because you closed this PR without merging, Renovate will ignore this update. You will not get PRs for any future 5.x releases. But if you manually upgrade to 5.x then Renovate will re-enable minor and patch updates automatically.

If you accidentally closed this PR, or if you changed your mind: rename this PR to get a fresh replacement PR.

### Renovate Ignore Notification Because you closed this PR without merging, Renovate will ignore this update. You will not get PRs for *any* future `5.x` releases. But if you manually upgrade to `5.x` then Renovate will re-enable `minor` and `patch` updates automatically. If you accidentally closed this PR, or if you changed your mind: rename this PR to get a fresh replacement PR.

Pull request closed

Sign in to join this conversation.
No Reviewers
No Label
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: djpbessems/Kubernetes.K3s.installLog#8
No description provided.